A better way to build power lines

Despite being very good at what we do, Michels Corporation people are always looking for ways to get even better.
A Michels crew in Pennsylvania recently designed a new method for building power transmission lines that results in improved safety and production. The operations team partnered with one of Michels mechanics to develop a roller system for a wire cart used in pulling electrical power lines into place. The innovation results in improved efficiency and reduced physical demands on the crew.