News & Resources

The Michels Insider

What's New at Michels

Direct Pipe project among year's best

Michels Corporation is proud to continue our tradition of excellence in trenchless installations by being honored as the runner-up in Trenchless Technology’s 2016 Project of the Year competition.

We were recognized for successfully completing a Direct Pipe installation in Freeport, Texas, that stretched the usage of the emerging method. The 48-inch diameter steel pipe spanned 4,038 feet, passing under a levee and the Dow Barge Canal. Michels suggested using Direct Pipe to meet the U.S. Army Corps of Engineers’ environmental and technical requirements for drilling under a levee.

The project is the longest Direct Pipe installation completed in North America, eclipsing the previous record by 500 feet.

"It's a great honor to be recognized for this project that stretches the limits of infrastructure construction," said Tim Michels, co-owner. 

Congratulations to everyone who played a role in this outstanding accomplishment!

Share!
Enjoy the article so far? Recommend it to your friends and peers.

Michels Corporation 
Copyright © 2019

The only way to be truly satisfied is to do
what you believe is great work.

Steve Jobs

It's not bragging if you can do it.

Contact Us