Paving

I-94 Reconstruction

I-94 Reconstruction

Scope

Michels simultaneously rebuilding and widening a 4.4-mile Central and 6.7-mile South segment of the project on I-94, a heavily traveled route linking between Chicago and Milwaukee. The roadway is being expanded from three lanes in each direction to four lanes plus widened shoulders. During peak paving operations, Michels has two large mainline crews and two smaller crews working along the project. Work was suspended during Wisconsin's winter.

  • Michels simultaneously rebuilding and widening a 4.4-mile Central and 6.7-mile South segment of the project on a heavily traveled route linking between Chicago and Milwaukee. The roadway is being expanded from three lanes in each direction to four lanes plus widened shoulders.

Projects

Michels managed the construction of the Mitchell Interchange reconstruction mega project as part of a joint venture.

Paving

Mitchell Interchange

Wisconsin

View Project

Mitchell Interchange

Michels is preforming work in a joint venture with Halmar International for the removal of an existing drawbridge and replacement with a permanent bridge that has twice the clearance for marine traffic.

Paving

Mill Basin Bridge

New York

View Project

Mill Basin Bridge

Michels furnished and installed hundreds of soldier piles, permanent grouted anchors and 85,000 square feet of lagging for permanent earth retention along the Zoo Interchange.

Paving

Zoo Interchange Phase I

Wisconsin

View Project

Zoo Interchange Phase I

Michels was the prime contractor for a reconstruction at the Kenosha Regional Airport. Michels performed all excavation, pipe underdrain, aggregate placing, concrete pavement, and topsoil operations to completely reconstruct and extend the main east/west runway and taxiway for the
airport. The runway was extended 1,100 feet to allow for larger aircraft to safely land and take off.

Paving

Kenosha Regional Airport

Wisconsin

View Project

Kenosha Regional Airport

Starting in fall 2019, Michels constructed 10-inch thick temporary concrete pavement in the median between the existing lanes of Northbound and Southbound I-39 at the USH 12/18 Interchange.

Paving

I-39 CTH AB to USH 12/18 Interchange

Wisconsin

View Project