Mary Hill Bypass
- LocationVancouver, Canada
- Timeline2016
-
Construction
MethodsMicrotunneling
Scope
Michels used microtunneling to build a 485-foot-long, 6-foot diameter tunnel under the Mary Hill Bypass, a major four-lane highway, to house a 5-foot-diameter water main.
This was one of the first microtunneling projects in the City of Vancouver.
Learn more about this project at https://trenchlesstechnology.com/microtunnelling-mary-hill-bypass/