SIAP 270 Class Change

SIAP 270 Class Change

Scope

To ensure the existing pipeline remains in compliance with federal regulations to maintain the desired operating pressure, Michels replaced two 20-inch sections of pipeline totaling 3,800 feet, installed a mainline value and performed hydrostatic testing of approximately 5,400 feet of pipeline to confirm class location. 

Achievements:
The project was completed ahead of the required schedule and had no OSHA-recordable safety incidents. 

  • To ensure the existing pipeline remains in compliance with federal regulations to maintain the desired operating pressure, Michels replaced two 20-inch sections of pipeline totaling 3,800 feet, installed a mainline value and performed hydrostatic testing of approximately 5,400 feet of pipeline to confirm class location.

Projects

Michels dewatering and pipeline construction operations teamed up to isolate standing water and control groundwater in permeable soils to allow a pipeline joint to be repaired.

Maintenance & Emergency Repairs

Anomaly Dig

Wisconsin

View Project

Anomaly Dig