Transmission & Distribution

Parnell to Williamsburg Transmission Line

Parnell to Williamsburg Transmission Line

Scope

Michels Power, Inc. installed 27 concrete caisson foundations ranging from 7 to 10 feet in diameter and up to 64 feet in depth and 73 direct embed excavations 5 feet in diameter and up to 36 feet in depth to support Michels Power's construction of a transmission line.

  • Michels installed 27 concrete caisson foundations ranging from 7 to 10 feet in diameter and up to 64 feet in depth and 73 direct embed excavations 5 feet in diameter and up to 36 feet in depth to support Michels' construction of a transmission line.

Projects

Michels installed approximately 250 miles of high voltage 345-kV AC transmission line.

Transmission & Distribution

Center-Grand Forks 345 kV Transmission Line

Minnesota and North Dakota

View Project

Center-Grand Forks 345 kV Transmission Line

Michels installed 55 miles of 345-kV double and single circuit conductor lines.

Transmission & Distribution

WETT Segments 2 & 6 345kV Transmission Line

Texas

View Project

WETT Segments 2 & 6 345kV Transmission Line

This Michels project consists of building 38 miles of transmission line as well as rebuilding nine miles of existing line in Massachusetts and Rhode Island.

Transmission & Distribution

New England East-West Solutions

Massachusetts and Rhode Island

View Project

New England East-West Solutions

Michels built 3.8 miles of 230kV triple-bundle transmission line to connect the Lackawanna substation to a new substation.

Transmission & Distribution

Lackawanna Transmission Line

Pennsylvania

View Project

Lackawanna Transmission Line

The only way to be truly satisfied is to do
what you believe is great work.

Steve Jobs

It's not bragging if you can do it.

Contact Us