Scope

Michels completed the 790 foot installation of a 42-inch steel pipeline for the Mariner East II project utilizing the Direct Pipe method. Direct Pipe combines a pipe thruster and tunneling machine, allowing a borehole to be created and pre-fabricated pipeline inserted in one continuous step.

The pipeline served as a conduit for a 16-inch product pipeline. The exit location of the pipe was in a 40-foot deep pit that allowed for machine retrieval and final tie-ins. Throughout the installation, crews experienced changing geological conditions from soft sandy clays to hard limestone and sand stone layers.

The project was performed in a rural environment with hills on both sides of the installation, which created geometry challenges during the design phase. The solution involved a trench at the entry to accommodate the pipe string, as well as a deep shaft at the exit location.

  • Michels completed the 790 foot installation of a 42-inch steel pipeline for the Mariner East II project utilizing the Direct Pipe method.
  • The solution involved a trench at the entry to accommodate the pipe string, as well as a deep shaft at the exit location.

Projects

Michels Direct Pipe contractors employed Direct Pipe to install approximately 860 feet of 48-inch steel pipeline underneath the North Pottstown Pike/Highway 100.

Direct Pipe

North Pottstown Pike Direct Pipe

Pennsylvania

View Project

North Pottstown Pike Direct Pipe

Quality means doing it right
when no one is looking.

Henry Ford

We do that.

Contact Us