Deep Foundations

Cabot Tap Line Rebuild

Cabot Tap Line Rebuild

Scope

Michels installed 53 caissons that ranged in diameter from 5 to 7 feet and up to 40 feet in depth in hard rock conditions, and also installed 13 direct embed excavations 3.5 feet in diameter up to 12 feet deep.

Projects

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Deep Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee.

Deep Foundations

Fiserv Forum

Wisconsin

View Project

Fiserv Forum

Michels built 458 secant piles and 100 caissons in 90 days for a 10-story, 600,000-square-foot building on the site of the new McDonald's corporate headquarters.

Deep Foundations

110 N Carpenter

Illinois

View Project

110 N Carpenter

Michels was selected as the foundations contractor for a caissons and earth retention system project.

Deep Foundations

State and Huron

Illinois

View Project

State and Huron

Michels installed 36 transmission line caisson foundations that were between 6-7 feet in diameter and 30 feet deep in hard rock conditions.

Deep Foundations

W175 Transmission Line

Massachusetts

View Project

W175 Transmission Line

Deep Foundations

Yesler Terrace

Washington

View Project

Yesler Terrace

Individual commitment to a group effort - that is what makes a team work, a company work, a society work, a civilization work.

Vince Lombardi

Great teamwork can do great things.