Deep Foundations

Children's Hospital Parking Lot

Children's Hospital Parking Lot

Scope

Michels designed and installed a 500-linear-foot sheet pile wall with three levels of tieback anchors for a permanent earth retention system. This earth retention system allowed the construction of parking structure for Children's Hospital. A temporary earth retention system comprised of H-pile/ wood lagging, sheet pile and tiebacks was designed and constructed to facilitate the construction of a mechanical room.

Sheet pile was installed with an ABI machine and ABI vibratory hammer. Prior to the sheeting installation, Michels used the ABI with a pre-drill attachment to pre-drill the sheet pile wall at each interlock location. Three Klemms were used to install the tiebacks.

  • Michels designed and installed a 500-linear-foot sheet pile wall with three levels of tieback anchors for a permanent earth retention system.
  • Michels designed and installed a 500-linear-foot sheet pile wall with three levels of tieback anchors for a permanent earth retention system.
  • Michels designed and installed a 500-linear-foot sheet pile wall with three levels of tieback anchors for a permanent earth retention system.
  • Michels designed and installed a 500-linear-foot sheet pile wall with three levels of tieback anchors for a permanent earth retention system.

Projects

Michels built 458 secant piles and 100 caissons in 90 days for a 10-story, 600,000-square-foot building on the site of the new McDonald's corporate headquarters.

Deep Foundations

110 N Carpenter

Illinois

View Project

110 N Carpenter

Deep Foundations

Yesler Terrace

Washington

View Project

Yesler Terrace

Michels scope of work is to install 242 drilled shafts to support the piers for anew bridge. The installation of the drilled shafts was completed with the simultaneous use of up to four drill rigs. Utilizing barges, 233 drilled shafts were installed in the river. Michels crews also installed 7-foot and 10-foot permanent steel casing into bedrock for each shaft.

Deep Foundations

I-74 Mississippi River Bridge

Illinois

View Project

I-74 Mississippi River Bridge

Michels installed 857 H-piles 60 feet deep to bedrock for a deep foundation system for the R1VER project, a mixed-use waterfront development.

Deep Foundations

R1VER

Wisconsin

View Project

R1VER

Michels, one of North America's largest deep foundations contractors, built a secant pile structure for an underground power substation at the base of a multi-use building in the city's historic Third Ward.

Deep Foundations

Juneau Town Substation

Wisconsin

View Project

Juneau Town Substation

Michels performed the removal and replacement of walkway and pier structures along the eastern extent of the De Pere Dam.

Deep Foundations

De Pere Dam Walkway Replacement

Wisconsin

View Project

De Pere Dam Walkway Replacement