Flanagan South Pipeline
- Location IL & MO
- Timeline2013-2014
-
Construction
MethodsConventional pipeline assembly line style lay, horizontal direction drilling, trenching completed with tezmec ditching machine, road bores with cradle auger machines and track auger machines, sheet pile installation and deep well dewatering systems.
Scope
Michels constructed two spreads for a total of 292 miles of 36" pipe installed including 12 horizontal directional drills and 26 mainline valve sites.