Michels Power, Inc. installed 642 drilled shafts under existing, energized 500kV transmission lines. The shafts ranged in diameter from 5.5-feet to 6.5-feet and were drilled to depths of 35 feet. All shafts were drilled under slurry. The terrain was flat and crews occasionally worked in wet land conditions, with wildlife such as snakes and alligators prevalent.

  • Michels installed 642 foundations under existing energized 500kV transmission lines. The terrain was flat and crews occasionally worked in wet land conditions, with wildlife such as snakes and alligators prevalent.
  • Michels installed 642 foundations under existing energized 500kV transmission lines. The terrain was flat and crews occasionally worked in wet land conditions, with wildlife such as snakes and alligators prevalent.
  • Michels installed 642 foundations under existing energized 500kV transmission lines. The terrain was flat and crews occasionally worked in wet land conditions, with wildlife such as snakes and alligators prevalent.

Projects

Michels Power, Inc. rebuilt a 4.5-mile section of a 115kV 1779 line.

Power Foundations

1779 Line Rebuild

Connecticut

View Project

1779 Line Rebuild

Michels Power, Inc. installed 39 drilled shafts and 120 helical piles for a substation foundation.

Power Foundations

Dunnell Park Substation

Rhode Island

View Project

Dunnell Park Substation

Michels Power, Inc. worked with an East Coast utility company to transform a 240-acre site on top of a closed coal mine into a 230kV electrical substation.

Power Foundations

Summit Substation

Pennsylvania

View Project

Summit Substation

The only way to be truly satisfied is to do
what you believe is great work.

Steve Jobs

It's not bragging if you can do it.

Contact Us