Market Square Development

Market Square Development

Scope

Michels designed and installed the earth retention for the Market Square development in Cleveland, Ohio. The project required earth retention to accommodate the 2 levels of parking below grade. One unique aspect of the project is that the sheeting on the project will remain exposed and act as the permanent exterior basement wall.

Michels installed 1,200 linear feel of sheeting around the full exterior of the building utilizing the ABI. A single row of 124 hollowbar tie-backs were installed to temporarily support the sheeting while the permanent interior concrete structure was installed. Despite existing utility challenges, the project was completed on time.

  • Michels designed and installed the earth retention for the Market Square development in Cleveland, Ohio.
  • Michels designed and installed the earth retention for the Market Square development in Cleveland, Ohio.

Projects

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Deep Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee.

Deep Foundations

Fiserv Forum

Wisconsin

View Project

Fiserv Forum

Michels built 458 secant piles and 100 caissons in 90 days for a 10-story, 600,000-square-foot building on the site of the new McDonald's corporate headquarters.

Deep Foundations

110 N Carpenter

Illinois

View Project

110 N Carpenter

Deep Foundations

Yesler Terrace

Washington

View Project

Yesler Terrace

Michels constructed secant compression ring launch and receiving shafts for a microtunneling project. The launch shaft was comprised of 46 intersecting 1-meter-diameter secant piles drilled to a depth of 54 feet. The receiving shaft was comprised of 38 intersecting 1-meter-diameter piles drilled to a depth of 52 feet.

Deep Foundations

Conduit 16 launch and receiving shafts

Colorado

View Project

Conduit 16 launch and receiving shafts

Michels scope of work is to install 242 drilled shafts to support the piers for anew bridge. The installation of the drilled shafts was completed with the simultaneous use of up to four drill rigs. Utilizing barges, 233 drilled shafts were installed in the river. Michels crews also installed 7-foot and 10-foot permanent steel casing into bedrock for each shaft.

Deep Foundations

I-74 Mississippi River Bridge

Illinois

View Project

I-74 Mississippi River Bridge

Nothing great in the world has
been accomplished without passion.

Georg Wilhelm Friedrich Hegel

Let us show you our passion.

Contact Us