Deep Foundations

110 N Carpenter

110 N Carpenter

Scope

Michels built 458 secant piles and 100 caissons in 90 days for a 10-story, 600,000-square-foot building on the site of the new McDonald's corporate headquarters. Each secant pile was 34 inches in diameter; and drilled to a depth between 40 and 100 feet. The caissons and secant piles make up an exposed basement wall for a two-story underground parking structure. Tremie pouring was used in all shafts 60 feet or deeper. Michels also drove sheet piling in the middle of the site for an elevator shaft and utility room.

Projects

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Deep Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee.

Deep Foundations

Fiserv Forum

Wisconsin

View Project

Fiserv Forum

Michels installed 53 caissons in Massachusetts.

Deep Foundations

Cabot Tap Line Rebuild

Massachusetts

View Project

Cabot Tap Line Rebuild

Michels was selected as the foundations contractor for a caissons and earth retention system project.

Deep Foundations

State and Huron

Illinois

View Project

State and Huron

Michels installed 36 transmission line caisson foundations that were between 6-7 feet in diameter and 30 feet deep in hard rock conditions.

Deep Foundations

W175 Transmission Line

Massachusetts

View Project

W175 Transmission Line

Deep Foundations

Yesler Terrace

Washington

View Project

Yesler Terrace