Michels managed the construction of the Mitchell Interchange reconstruction mega project as part of a joint venture. The Mitchell Interchange is one of the busiest interchanges in the state of Wisconsin. Project time constraints required Michels to perform multiple paving operations simultaneously while under traffic. The project consisted of 14 miles of 24-foot wide mainline paving which included paving three tunnel floors, 18 miles of 12-foot shoulder, and three miles of ramps. The project received the Special Recognition Award in the Mega Projects category from the Wisconsin Transportation Builders Association.

  • Michels managed the construction of the Mitchell Interchange reconstruction mega project as part of a joint venture.
  • Michels managed the construction of the Mitchell Interchange reconstruction mega project as part of a joint venture named Wisconsin Constructors, LLC.

Projects

Michels is preforming work in a joint venture with Halmar International for the removal of an existing drawbridge and replacement with a permanent bridge that has twice the clearance for marine traffic.

Paving

Mill Basin Bridge

New York

View Project

Mill Basin Bridge

Michels furnished and installed hundreds of soldier piles, permanent grouted anchors and 85,000 square feet of lagging for permanent earth retention along the Zoo Interchange.

Paving

Zoo Interchange Phase I

Wisconsin

View Project

Zoo Interchange Phase I

Michels simultaneously rebuilding and widening a 4.4-mile Central and 6.7-mile South segment of the project on a heavily traveled route linking between Chicago and Milwaukee. The roadway is being expanded from three lanes in each direction to four lanes plus widened shoulders.

Paving

I-94 Reconstruction

Wisconsin

View Project

I-94 Reconstruction

Michels was the prime contractor for a reconstruction at the Kenosha Regional Airport. Michels performed all excavation, pipe underdrain, aggregate placing, concrete pavement, and topsoil operations to completely reconstruct and extend the main east/west runway and taxiway for the
airport. The runway was extended 1,100 feet to allow for larger aircraft to safely land and take off.

Paving

Kenosha Regional Airport

Wisconsin

View Project

Kenosha Regional Airport

Starting in fall 2019, Michels constructed 10-inch thick temporary concrete pavement in the median between the existing lanes of Northbound and Southbound I-39 at the USH 12/18 Interchange.

Paving

I-39 CTH AB to USH 12/18 Interchange

Wisconsin

View Project

I-39 CTH AB to USH 12/18 Interchange