Substations

Newport Clenera Interconnection

Newport Clenera Interconnection

Scope

Michels Power, Inc. performed demolition and construction services for a new 161kV bay, three breaker installations with associated cabling, and other electric equipment installation and wiring. Michels Power removed two existing breakers during the outage held for the two replacement breakers to be installed, and one additional breaker with a crane. Additional deadend and associated equipment was also installed using a crane. Hydro-excavation techniques were used for connecting additional ground tails to the existing ground grid and additional conduit installation. A single drum puller was used to pull the cable.

  • Michels Power, Inc. performed demolition and construction services for a new 161kV bay, three breaker installations with associated cabling, and other electric equipment installation and wiring.

Projects

Michels Power, Inc. worked with an East Coast utility company to transform a 240-acre site on top of a closed coal mine into a 230kV electrical substation. Michels constructed 240 7-inch micropiles with rock sockets and drilled 190 shafts with rock sockets.

Substations

Pennsylvania substation

Pennsylvania

View Project

Pennsylvania substation

The Raccoon Trail project was an engineer, procure and construct contract that Michels Power, Inc. was responsible for all of the facets of that project.  All equipment with the exception of the 345kV circuit breakers were procured by Michels Power, Inc.

Substations

Raccoon Trail

Iowa

View Project

Raccoon Trail

Michels Power, Inc. was contracted to completely reconstruct an HVDC Substation and AC to DC Converter System to increase grid reliability and reduce power loss.

Substations

Coal Creek and Dickinson

North Dakota and Minnesota

View Project

Coal Creek and Dickinson

Michels Power, Inc. was contracted to expand two substations to accommodate for the increased load required by a Paper Mill and update a substation which was at capacity.

Substations

Substation Load Addition

Washington

View Project

Substation Load Addition

Substations

Windsor OCB Replacement

Connecticut

View Project

Windsor OCB Replacement

The only way to be truly satisfied is to do
what you believe is great work.

Steve Jobs

It's not bragging if you can do it.

Contact Us