Nexus Gas Transmission Pipeline
- Location Michigan & Ohio
- Timeline2017-2018
-
Construction
MethodsMainline Pipeline, Horizontal Directional Drilling, Dewatering, Sheet Piles, Facilities
Scope
Michels built 177 miles of 36-inch natural gas transmission pipeline, three meter and two compressor stations, both with 29,700 HP single turbine engines. In total, Michels mobilized 2,000 people and 1,000 pieces of equipment. The project included 224 road bores, 88 crews and 12 Horizontal Directional Drills.