Manhole Rehabilitation

Orange County Feeder Relining Reach 2

Orange County Feeder Relining Reach 2

Scope

Michels performed the removal and disposal of the existing Coal Tar Enamel (CTE) lining from approximately 18,000 feet (13 segments ranging from 900 feet to 1,600 feet in lengths) of 36-inch diameter pipe. The project also included installing cement mortar lining, removing portions of the existing pipeline and manhole structures, installing new pipe and manhole structures, welding butt straps, installing air release valves, salvaging existing plug valves, and installing Metropolitan-furnished valves. The work was accessed from 14 work pits spaced approximately 1,200 feet apart.

  • Michels performed the removal and disposal of the existing Coal Tar Enamel (CTE) lining from approximately 18,000 feet (13 segments ranging from 900 feet to 1,600 feet in lengths) of 36-inch diameter pipe.
  • Michels performed the removal and disposal of the existing Coal Tar Enamel (CTE) lining from approximately 18,000 feet (13 segments ranging from 900 feet to 1,600 feet in lengths) of 36-inch diameter pipe.

Projects

Michels installs a 39-inch cured-in-place pipe (CIPP) liner to rehabilitate a sewer line.

Manhole Rehabilitation

1-MN-341 Interceptor Rehabilitation

Minnesota

View Project

1-MN-341 Interceptor Rehabilitation

Michels was the prime contractor for the reconstruction of King Court and construction of Beechtree Lane.

Manhole Rehabilitation

Beechtree Lane/ King Court

Wisconsin

View Project

Beechtree Lane/ King Court

Michels utilized ultraviolet light (UV) cured-in-place (CIPP) pipe liners to rehabilitate nearly 45,000 linear feet of sanitary sewer pipes and 138 manholes in Guam, making it among the largest UV projects in the United States.

Manhole Rehabilitation

Northern Interceptor Sewer Rehab

Guam

View Project

Northern Interceptor Sewer Rehab

Michels performed a CIPP lining project for the Metropolitan Council in Minnesota. The project included the rehabilitation of 3,850 LF of 96" pipe, 144 LF of 72" pipe, and reconstruction of manholes.

Manhole Rehabilitation

North Area Interceptor Phase 9

Minnesota

View Project

North Area Interceptor Phase 9

Michels restored more than a mile of sanitary sewer pipes on the St. Paul Interceptor.

Manhole Rehabilitation

St. Paul Interceptor

Minnesota

View Project

St. Paul Interceptor

One learns more from listening than speaking...

Thor Heyerdahl

We listen to you.

Contact Us