Scope

Pump station #34 required the installation of 146 drilled shafts to establish the foundation for the station concrete pads and pipe supports. Michels utilized an IMT 190 and IMT 270 drill rig and 70-ton telescoping crane to drill 36 30-inch holes, 110 24-inch holes, and set rebar cages in each hole to a 25-foot embedment length. The rebar cages were tied onsite and set to varying heights. This required the crew to create wood frames to support the cages weight prior to the concrete installation. Michels utilized a concrete pump truck to pour the concrete.

  • Pump station #34 required the installation of 146 drilled shafts to establish the foundation for the station concrete pads and pipe supports.

Projects

Michels completed 14 horizontal directional drills (HDD), custom fabricated facilities; built three pump stations; and performed heavy civil and foundations work.

Pipe Fabrication

Dakota Access Pipeline Project

Iowa, South Dakota, North Dakota

View Project

Dakota Access Pipeline Project

Michels managed and constructed the piping, mechanical scopes and pump installation of the Delavan Pump Station for Enbridge.

Pipe Fabrication

Delavan Pump Station

Wisconsin

View Project

Delavan Pump Station