Grading & Excavations

Sugarloaf Substation

Sugarloaf Substation

Scope

Michels performed subgrade preparation and paving of approximately 38,534 square feet of a new asphalt access road, included excavation and grading for a new retention pond and substation subgrade preparation over an area of approximately 27,000 square feet. Installation of an anchored gabion mattress system was necessary to stabilize the 1:1 slope at the northeastern corner of the substation.

Projects

Michels constructed a 1,200-foot slurry trench near the riverward toe of a levee at the south end of the Bois de Sioux Golf Course.

Grading & Excavations

Wahpeton Slurry Trench

North Dakota

View Project

Wahpeton Slurry Trench

Michels performed heavy civil earthwork, concrete installation and storm sewer construction for two crossovers linking a taxiway with a runway.

Grading & Excavations

Dane County Airport Reconfiguration

Wisconsin

View Project

Dane County Airport Reconfiguration

Michels excavated more than 166,000 lineal feet of 3-4 foot deep trenches for 16 solar farm sites at various locations throughout Minnesota.

Grading & Excavations

Aurora Solar

Minnesota

View Project

Aurora Solar

Michels was the prime contractor for the reconstruction of King Court and construction of Beechtree Lane.

Grading & Excavations

Beechtree Lane/ King Court

Wisconsin

View Project

Beechtree Lane/ King Court

Michels performed the environmental restoration of 155 acres within Jackson Park in Chicago.

Grading & Excavations

Jackson Park Restoration

Illinois

View Project

Jackson Park Restoration

Michels performed a project consisting of the removal of the Alderwood Dam Bridge including the primary and secondary spillways, removal of organic muck lake bottom soils, and removal of the existing asphalt roadway.

Grading & Excavations

Alderwood Dam Bridge

Wisconsin

View Project

Alderwood Dam Bridge

One learns more from listening than speaking...