Michels used the Direct Pipe methodology to complete two installations on a natural gas pipeline project. The first alignment stretched 1,089 feet under two rail lines, reaching a maximum depth of 40 feet. The second alignment spanned 1,020 feet under a busy highway, reaching a maximum depth of 35 feet. Both projects were completed from surface launches in crowded utility corridors.

Projects

Michels used the Direct Pipe methodology to install a 48-inch gas pipeline under the Rio Grande and the border between the United States and Mexico.