Foundations

Train Platform

Train Platform

Scope

Michels worked in close proximity to live freight and pedestrian rail traffic and overhead rail signal lines to construct a temporary pedestrian train platform across the street from Silver Cross Field in Illinois. Michels used an excavator-mounted, high-reach vibratory hammer to install 460 linear feet of driven sheet pile within 20 feet of the live rail traffic. Michels also drove 12 3/4-inch diameter pipe pile to rock using a crane with swinging leads and a hydraulic hammer to support a prefabricated ramp to access the platform.

Projects

Michels installed caissons on a small site along the in downtown Chicago. The caissons ranged in diameter from 4 to 6 feet and were drilled to an average depth of 90 feet.

Foundations

River Point Plaza

Illinois

View Project

River Point Plaza

Michels designed and built an Earth Retention System to provide global stability for a recreational and ski hill that had been experiencing multiple slope failures.

Foundations

Mont Du Lac

Wisconsin

View Project

Mont Du Lac

Michels designed and installed an Earth Retention System (ERS) for a new pedestrian tunnel that was bored under three live Metra and Union Pacific rail lines.

Foundations

Metra Lombard Station

Illinois

View Project

Metra Lombard Station

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels installed 64 micropiles to construct a deep foundation system for an existing parking garage.

Foundations

Parking Garage

Wisconsin

View Project

Parking Garage

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee.

Foundations

Sports Arena

Wisconsin

View Project

Sports Arena