Train Platform

Train Platform

Scope

Michels worked in close proximity to live freight and pedestrian rail traffic and overhead rail signal lines to construct a temporary pedestrian train platform across the street from Silver Cross Field in Illinois. Michels used an excavator-mounted, high-reach vibratory hammer to install 460 linear feet of driven sheet pile within 20 feet of the live rail traffic. Michels also drove 12 3/4-inch diameter pipe pile to rock using a crane with swinging leads and a hydraulic hammer to support a prefabricated ramp to access the platform.

  • Michels worked in close proximity to live freight and pedestrian rail traffic and overhead rail signal lines to construct a temporary pedestrian train platform.

Projects

Michels designed and installed an Earth Retention System (ERS) for a new pedestrian tunnel that was bored under three live Metra and Union Pacific rail lines.

Foundations

Metra Lombard Station

Illinois

View Project

Metra Lombard Station

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels installed 64 micropiles to construct a deep foundation system for an existing parking garage.

Foundations

Parking Garage

Wisconsin

View Project

Parking Garage

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee.

Foundations

Fiserv Forum

Wisconsin

View Project

Fiserv Forum

Michels scope of work is to install 242 drilled shafts to support the piers for anew bridge. The installation of the drilled shafts was completed with the simultaneous use of up to four drill rigs. Utilizing barges, 233 drilled shafts were installed in the river. Michels crews also installed 7-foot and 10-foot permanent steel casing into bedrock for each shaft.

Foundations

I-74 Mississippi River Bridge

Illinois

View Project

I-74 Mississippi River Bridge

Michels constructed an underground water retention cistern inside of an occupied apartment  building. Due to historic water levels in Milwaukee, WI, a parking garage had been underwater and inaccessible since March of 2019.

Foundations

210 Water St.

Wisconsin

View Project

210 Water St.

Individual commitment to a group effort - that is what makes a team work, a company work, a society work, a civilization work.

Vince Lombardi

Great teamwork can do great things.