Michels installed 234 driven piles for the Valley City State University's Center for the Arts. The project site had extensive soft to very soft clays with layers of loose sand that could not support the heady loads on the new concert hall.

The piles were 9-5/8 inches in diameter and were 80 feet in length. Each pile was filled with concrete and had 1 welded splice. Three pile driving analyzer (PDA) tests were completed on production piles to confirm capacity and establish driving criteria for the project.

  • Michels installed 234 driven piles for the Valley City State University's Center for the Arts. The project site had extensive soft to very soft clays with layers of loose sand that could not support the heady loads on the new concert hall.
  • Michels installed 234 driven piles for the Valley City State University's Center for the Arts. The project site had extensive soft to very soft clays with layers of loose sand that could not support the heady loads on the new concert hall.

Projects

Michels built 458 secant piles and 100 caissons in 90 days for a 10-story, 600,000-square-foot building on the site of the new McDonald's corporate headquarters.

Deep Foundations

110 N Carpenter

Illinois

View Project

110 N Carpenter

Deep Foundations

Yesler Terrace

Washington

View Project

Yesler Terrace

Michels scope of work is to install 242 drilled shafts to support the piers for anew bridge. The installation of the drilled shafts was completed with the simultaneous use of up to four drill rigs. Utilizing barges, 233 drilled shafts were installed in the river. Michels crews also installed 7-foot and 10-foot permanent steel casing into bedrock for each shaft.

Deep Foundations

I-74 Mississippi River Bridge

Illinois

View Project

I-74 Mississippi River Bridge

Michels installed 857 H-piles 60 feet deep to bedrock for a deep foundation system for the R1VER project, a mixed-use waterfront development.

Deep Foundations

R1VER

Wisconsin

View Project

R1VER

Michels, one of North America's largest deep foundations contractors, built a secant pile structure for an underground power substation at the base of a multi-use building in the city's historic Third Ward.

Deep Foundations

Juneau Town Substation

Wisconsin

View Project

Juneau Town Substation

Michels performed the removal and replacement of walkway and pier structures along the eastern extent of the De Pere Dam.

Deep Foundations

De Pere Dam Walkway Replacement

Wisconsin

View Project

De Pere Dam Walkway Replacement

Nothing great in the world has
been accomplished without passion.

Georg Wilhelm Friedrich Hegel

Let us show you our passion.

Contact Us