Scope

Long Draw to Scurry, Segment 2, is an 18 mile, 345 kV double circuit, double-bundled conductor line. Sand Bluff to Divide, Segment 6, is a single-circuit double bundled conductor line spanning 37 miles. Michels Power, Inc. installed foundations and OPGW on both lines.

  • Michels Power, Inc. installed 55 miles of 345-kV double and single circuit conductor lines.
  • Michels Power, Inc. installed 55 miles of 345-kV double and single circuit conductor lines.

Projects

Michels Power, Inc. installed approximately 250 miles of high voltage 345-kV AC transmission line.

Transmission & Distribution

Center-Grand Forks 345 kV Transmission Line

Minnesota and North Dakota

View Project

Center-Grand Forks 345 kV Transmission Line

This Michels Power, Inc. project consists of building 38 miles of transmission line as well as rebuilding nine miles of existing line in Massachusetts and Rhode Island.

Transmission & Distribution

New England East-West Solutions

Massachusetts and Rhode Island

View Project

New England East-West Solutions

Michels Power, Inc. installed 27 concrete caisson foundations ranging from 7 to 10 feet in diameter and up to 64 feet in depth and 73 direct embed excavations 5 feet in diameter and up to 36 feet in depth to support Michels' construction of a transmission line.

Transmission & Distribution

Parnell to Williamsburg Transmission Line

Iowa

View Project

Parnell to Williamsburg Transmission Line

Michels Power, Inc. built 3.8 miles of 230kV triple-bundle transmission line to connect the Lackawanna substation to a new substation.

Transmission & Distribution

Lackawanna Transmission Line

Pennsylvania

View Project

Lackawanna Transmission Line

Individual commitment to a group effort - that is what makes a team work, a company work, a society work, a civilization work.

Vince Lombardi

Great teamwork can do great things.

Contact Us