Michels constructed the foundations for a new Eagle Observation Tower in Door County's Peninsula State Park.

Deep Foundations

Eagle Observation Tower

Wisconsin

View Project

Eagle Observation Tower

Michels was contracted to complete the final segment of a 20-inch and 36-inch liquid pipelines.

Houston Ship Channel

Texas

View Project

Houston Ship Channel

Michels installed 234 driven piles for the Valley City State University's Center for the Arts. The project site had extensive soft to very soft clays with layers of loose sand that could not support the heady loads on the new concert hall.

Deep Foundations

VCSU Center for the Arts

North Dakota

View Project

VCSU Center for the Arts

Michels designed a water diversion solution for the Little Calumet River for an anomaly dig. The river serves as a drainage canal for the area and can rise at least 4 inches in water elevation. As little as 1 inch of rain can substantially alter the flow of the river.

Dewatering and Groundwater Control

Little Calumet River Dewatering

Indiana

View Project

Little Calumet River Dewatering

Michels performed a repair of the Riverside Theater dock wall. Heavy rainstorms in Spring of 2020 caused the water levels of the Milwaukee River and Lake Michigan to rapidly rise, placing additional stress on the 1920's
wakefield wall and building foundation.

Deep Foundations

Riverside Theater Dock Wall Injection

Wisconsin

View Project

Riverside Theater Dock Wall Injection

Michels was contracted to install two new sections of a 10-inch pipeline beneath the Anchor River as critical links to complete an expansion project.

Horizontal Directional Drilling

Anchor River Crossings

Alaska

View Project

Anchor River Crossings

Starting in fall 2019, Michels constructed 10-inch thick temporary concrete pavement in the median between the existing lanes of Northbound and Southbound I-39 at the USH 12/18 Interchange.

Paving

I-39 CTH AB to USH 12/18 Interchange

Wisconsin

View Project

I-39 CTH AB to USH 12/18 Interchange

Michels installed roughly 60,000 feet of 2-inch and 4-inch plastic main and 130 residential gas services to convert residences and commercial properties from propane or electric heat to natural gas.

Nowthen Conversion

Minnesota

View Project

Nowthen Conversion

Michels Power, Inc. built 15 caissons and completed 12 direct embed installations for structures on a 345kV electrical power transmission line.

Power Foundations

Transmission Line ACR Foundations

Massachusetts

View Project

Transmission Line ACR Foundations

Michels Utility Services, Inc. was asked to rock bore a crossing under Jacobson Creek to install 400 feet of 4-inch polyethylene gas pipe.

Jacobson Road Creek Crossing

Wisconsin

View Project

Jacobson Road Creek Crossing

Michels installed 65 miles of 24-inch steel natural gas pipeline to provide natural gas service from Whitehall, IL to the St. Louis, MO metro area.

Mainline Pipeline

St. Louis Area Pipeline

Illinois & Missouri

View Project

St. Louis Area Pipeline

Michels was selected as the foundation contractor to design and build the earth retention system for a 20-foot wide fish passage structure for the Cle Elum Dam.

Earth Retention Systems

Cle Elum Dam

Washington

View Project

Cle Elum Dam

Michels performed revetments for various homeowners along the western coast of Lake Michigan in Illinois.

Marine Construction

Lake Michigan Revetments

Illinois

View Project

Lake Michigan Revetments

Michels worked from land and from barges to remove 800 feet of deteriorating timber and concrete seawall along the Kewaunee River in Harbor Park before replacing it with 800 feet of anchored steel sheet pile bulkhead.

Marine Construction

Kewaunee Dockwall and Harbor Improvement

Wisconsin

View Project

Kewaunee Dockwall and Harbor Improvement

Michels rebuilt 1,250 feet of the South Breakwater of Sheboygan Harbor.

Deep Foundations

South Breakwall Repair

Wisconsin

View Project

South Breakwall Repair

Michels replaced municipal water mains on ten thoroughfares.

Municipal Water Main Replacement Program

California

View Project

Municipal Water Main Replacement Program

Michels performed the removal and disposal of the existing Coal Tar Enamel (CTE) lining from approximately 18,000 feet (13 segments ranging from 900 feet to 1,600 feet in lengths) of 36-inch diameter pipe.

Manhole Rehabilitation

Orange County Feeder Relining Reach 2

California

View Project

Orange County Feeder Relining Reach 2

Michels designed and installed the earth retention for the Market Square development in Cleveland, Ohio.

Deep Foundations

Market Square Development

Ohio

View Project

Market Square Development

Michels installed various forms of earth retention systems using steel sheet pile, secant shafts and drilled shafts. The customer required deep foundations in an area with a high water table. The earth retention systems Michels installed allowed crews to pour the foundations in a dry working area.

Deep Foundations

Matalco

Wisconsin

View Project

Matalco

Michels completed the installation of approximately 650 feet of 48-inch steel pipeline underneath the Juniata River via Direct Pipe® method.

Direct Pipe

Juniata River Direct Pipe Installation

Pennsylvania

View Project

Juniata River Direct Pipe Installation

Michels cleaned, dewatered and applied 2.75 inches of geopolymer mortar to a 96-foot-long corrugated metal arch culvert placed to drain the upstream Mill Creek watershed under Washington Street.

Culvert Repair

Washington Street Culvert Repair

Illinois

View Project

Washington Street Culvert Repair

Michels was contracted to relocate a pipe line from the fog line (the solid white line on the outside right edge of the lane) in the east bound lane of Grant Line Road to approximately 200 feet to the south.

Grantline Relocation

California

View Project

Grantline Relocation

Michels installed large 8 foot diameter drilled shafts with rock sockets in 15,000 psi sandstone, soldier pile installation, permanent ground anchors, and lagging installation in Scottsburg, OR on the Umpqua River.

Deep Foundations

Umpqua River Bridge Replacement

Oregon

View Project

Umpqua River Bridge Replacement

Michels installed nearly 100 miles of 10.75-inch driven pipe pile to support the construction of a new corporate office.

Deep Foundations

South Harbor Campus

Wisconsin

View Project

South Harbor Campus

Michels Power, Inc. installed 197 miles of mainline fiber and 52 miles of service entrances. The project took place over 250 square miles of rolling hills, several creeks and into 4 different counties in Oklahoma.

Underground Line & Cable

Crescent and Orlando Exchanges

Oklahoma

View Project

Crescent and Orlando Exchanges

Michels was the prime contractor for a reconstruction at the Kenosha Regional Airport. Michels performed all excavation, pipe underdrain, aggregate placing, concrete pavement, and topsoil operations to completely reconstruct and extend the main east/west runway and taxiway for the
airport. The runway was extended 1,100 feet to allow for larger aircraft to safely land and take off.

Aviation

Kenosha Regional Airport

Wisconsin

View Project

Kenosha Regional Airport

Michels repaired and replaced 8 tainter gates and 9 existing concrete piers at the Kaukauna Dam. The dam was last rebuilt almost 90 years ago, and was severely deteriorating.

Deep Foundations

Kaukauna Dam Tainter Gate Replacement

Wisconsin

View Project

Kaukauna Dam Tainter Gate Replacement

After a canal in Kearney, NE closed for winter, a Michels crew rehabilitated 300 feet of a deteriorating 84-inch corrugated metal pipe inside the wasteway.

Pipe Rehabilitation

Cottonmill Wastewater Rehabilitation

Nebraska

View Project

Cottonmill Wastewater Rehabilitation

Michels Power, Inc. installed 13 caisson foundations inside of the PPL Quarry 230kV-69kV substation in Bethlehem, Pennsylvania. The foundations ranged in diameter from 6.5 to 8 feet and were excavated up to 45 feet deep.

Northern Lehigh Reliability Project Quarry Sub Rebuild

Pennsylvania

View Project

Northern Lehigh Reliability Project Quarry Sub Rebuild

Substations

Windsor OCB Replacement

Connecticut

View Project

Windsor OCB Replacement

Michels Power, Inc. was contracted to expand two substations to accommodate for the increased load required by a Paper Mill and update a substation which was at capacity.

Substations

Substation Load Addition

Washington

View Project

Substation Load Addition

Michels Power, Inc. was contracted to completely reconstruct an HVDC Substation and AC to DC Converter System to increase grid reliability and reduce power loss.

Substations

Coal Creek and Dickinson

North Dakota and Minnesota

View Project

Coal Creek and Dickinson

The Raccoon Trail project was an engineer, procure and construct contract that Michels Power, Inc. was responsible for all of the facets of that project.  All equipment with the exception of the 345kV circuit breakers were procured by Michels Power, Inc.

Substations

Raccoon Trail

Iowa

View Project

Raccoon Trail

Michels Power, Inc. performed demolition and construction services for a new 161kV bay, three breaker installations with associated cabling, and other electric equipment installation and wiring.

Substations

Newport Clenera Interconnection

Iowa

View Project

Newport Clenera Interconnection

Michels Power, Inc. worked with an East Coast utility company to transform a 240-acre site on top of a closed coal mine into a 230kV electrical substation.

Power Foundations

Summit Substation

Pennsylvania

View Project

Summit Substation

Michels Power, Inc. installed 642 foundations under existing energized 500kV transmission lines. The terrain was flat and crews occasionally worked in wet land conditions, with wildlife such as snakes and alligators prevalent.

Power Foundations

500kV Rebuild Phase D

Florida

View Project

500kV Rebuild Phase D

Michels Power, Inc. installed 39 drilled shafts and 120 helical piles for a substation foundation.

Power Foundations

Dunnell Park Substation

Rhode Island

View Project

Dunnell Park Substation

Michels Power, Inc. rebuilt a 4.5-mile section of a 115kV 1779 line.

Power Foundations

1779 Line Rebuild

Connecticut

View Project

1779 Line Rebuild

Michels rehabilitated 75 linear feet of a 60-inch corrugated metal culvert pipe with 1-1/2" of geopolymer mortar spray-in-place pipe (SIPP) lining.Michels obtained the geopolymer mortar in dry form and mixed the material on-site prior to and during application.

Culvert Repair

Rural Wisconsin culvert repair

Wisconsin

View Project

Rural Wisconsin culvert repair

Michels redesigned and used horizontal directional drilling to complete a 2,384-foot crossing of 12-inch STW pipe under the Missouri River.

Horizontal Directional Drilling

Glacier Replacement HDD

Montana

View Project

Glacier Replacement HDD

To ensure the existing pipeline remains in compliance with federal regulations to maintain the desired operating pressure, Michels replaced two 20-inch sections of pipeline totaling 3,800 feet, installed a mainline value and performed hydrostatic testing of approximately 5,400 feet of pipeline to confirm class location.

Maintenance & Emergency Repairs

SIAP 270 Class Change

Pennsylvania

View Project

SIAP 270 Class Change

Michels used Cured-in-Place Pipe (CIPP) liners to rehabilitate 2,125 feet of World War II-era cast iron water mains at an airport in Madison, WI.

Pipe Rehabilitation

Dane County Regional Airport Potable Water CIPP

Wisconsin

View Project

Dane County Regional Airport Potable Water CIPP

Michels Direct Pipe contractors employed Direct Pipe to install approximately 860 feet of 48-inch steel pipeline underneath the North Pottstown Pike/Highway 100.

Direct Pipe

North Pottstown Pike Direct Pipe

Pennsylvania

View Project

North Pottstown Pike Direct Pipe

Michels completed the 790 foot installation of a 42-inch steel pipeline for the Mariner East II project utilizing the Direct Pipe method.

Direct Pipe

Aughwick Creek Direct Pipe

Pennsylvania

View Project

Aughwick Creek Direct Pipe

Michels installed 180 feet of a cured in place pipe liner into a 60-inch segmental reinforced concrete culvert to restore its hydraulic integrity and repair areas where concrete was spalling and reinforcing steel was exposed.

Culvert Repair

Manitowoc Culvert Lining

Wisconsin

View Project

Manitowoc Culvert Lining

Michels was contracted to design and install secant shafts as temporary earth retention to allow for the excavation of approximately 71 feet below grade to install a new pump station.

Deep Foundations

Pump Station 4 Reconstruction

Illinois

View Project

Pump Station 4 Reconstruction

Michels performed the removal and replacement of walkway and pier structures along the eastern extent of the De Pere Dam.

Deep Foundations

De Pere Dam Walkway Replacement

Wisconsin

View Project

De Pere Dam Walkway Replacement

Michels performed a CIPP lining project for the Metropolitan Council in Minnesota. The project included the rehabilitation of 3,850 LF of 96" pipe, 144 LF of 72" pipe, and reconstruction of manholes.

Inflow/Infiltration-Grouting-Manholes-Bypass Pumping

North Area Interceptor Phase 9

Minnesota

View Project

North Area Interceptor Phase 9

Michels restored more than a mile of sanitary sewer pipes on the St. Paul Interceptor.

Cured-In-Place Pipe (CIPP)

St. Paul Interceptor

Minnesota

View Project

St. Paul Interceptor

Michels completed a complex design-build construction project for the Jacksonville Electric Authority performing horizontal directional drilling (HDD), reaming and pullback operations for a 36" steel water main that spanned 6,575'.

Horizontal Directional Drilling

St. John's River Crossing Design Build

Florida

View Project

St. John's River Crossing Design Build

Michels installed 12 soldier piles for a permanent precast concrete retaining wall.

Foundations

Carter Hotel Demolition

Minnesota

View Project

Carter Hotel Demolition

Michels utilized ultraviolet light (UV) cured-in-place (CIPP) pipe liners to rehabilitate nearly 45,000 linear feet of sanitary sewer pipes and 138 manholes in Guam, making it among the largest UV projects in the United States.

Cured-In-Place Pipe (CIPP)

Northern Interceptor Sewer Rehab

Guam

View Project

Northern Interceptor Sewer Rehab

Michels performed a pipe rehabilitation repair of a sewer main that had ruptured in multiple locations.

Chemical Grouting

River Ave Force Main Rehabilitation

Connecticut

View Project

River Ave Force Main Rehabilitation

Michels Foundations was contracted to install drilled shafts to support a newly constructed replacement bridge for a Railway Company in Old Monroe, MO.

Foundations

Old Monroe Railway Bridge

Missouri

View Project

Old Monroe Railway Bridge

Michels constructed an underground water retention cistern inside of an occupied apartment  building. Due to historic water levels in Milwaukee, WI, a parking garage had been underwater and inaccessible since March of 2019.

Dewatering and Groundwater Control

210 Water Street

Wisconsin

View Project

210 Water Street

Michels, one of North America's largest deep foundations contractors, built a secant pile structure for an underground power substation at the base of a multi-use building in the city's historic Third Ward.

Deep Foundations

Juneau Town Substation

Wisconsin

View Project

Juneau Town Substation

Michels installed 857 H-piles 60 feet deep to bedrock for a deep foundation system for the R1VER project, a mixed-use waterfront development.

Deep Foundations

R1VER

Wisconsin

View Project

R1VER

Pipe plowing with custom-made plow

Gas Distribution

Creekside Estates Subdivision

Wisconsin

View Project

Creekside Estates Subdivision

<p>The Bakken Missouri River Crossing Project connects an existing compressor station located in the Bakken shale oil fields in Williams County, North Dakota, to a natural gas gathering system located in McKenzie County, North Dakota.</p>

Horizontal Directional Drilling

Bakken Missouri River Crossing

North Dakota

View Project

Bakken Missouri River Crossing

Federal

Naval Facilities Engineering Command - Ford Island

Hawaii

View Project

Naval Facilities Engineering Command - Ford Island

Michels Power, Inc. performed an emergency repair after straight line winds passed through East Moline, IL and broke five H-frames.

Storm Restoration Contractor

Sub 31 to 39 H-Frame Repair

Illinois

View Project

Sub 31 to 39 H-Frame Repair

Michels rehabilitated a deteriorating corrugated metal pipe culvert under a busy roadway. Michels prepared the walls and floor and completed the spray application of 3-inch Millikin Geospray geopolymer mortar to the 128-inch-by-73-inch-by-75-foot culvert. In total, 68,000 pounds of material was mixed and applied.

Culvert Repair

Palos Hills Culvert Rehabilitation

Illinois

View Project

Palos Hills Culvert Rehabilitation

Michels scope of work is to install 242 drilled shafts to support the piers for anew bridge. The installation of the drilled shafts was completed with the simultaneous use of up to four drill rigs. Utilizing barges, 233 drilled shafts were installed in the river. Michels crews also installed 7-foot and 10-foot permanent steel casing into bedrock for each shaft.

Deep Foundations

I-74 Mississippi River Bridge

Illinois

View Project

I-74 Mississippi River Bridge

Michels developed a diversion plan for Hay Creek to allow a pipeline crew to perform an anomaly dig to repair an imperfection of a high-pressure pipeline that crossed the creek.

Dewatering and Groundwater Control

Hay Creek Stream Diversion

Wisconsin

View Project

Hay Creek Stream Diversion

Michels Dewatering group was tasked to design, install and operate a system to divert peak flows of up to 168,000 gallons per minute, or 242 million gallons per day, so that a pipeline could be open cut in dry conditions across the Conotton Creek.

Dewatering and Groundwater Control

Conotton Creek Diversion

Ohio

View Project

Conotton Creek Diversion

Michels designed, furnished and installed a siphon system to draw down water elevation in a pond impoundment area and maintain upstream river flow during the removal of a high-risk dam. The system consisted of 14 30-inch HDPE siphons, flow-monitoring meters, stainless steel knife gate valves and a priming system.

Bypass Pumping

Boardman Dam removal

Michigan

View Project

Boardman Dam removal

Michels simultaneously rebuilding and widening a 4.4-mile Central and 6.7-mile South segment of the project on a heavily traveled route linking between Chicago and Milwaukee. The roadway is being expanded from three lanes in each direction to four lanes plus widened shoulders.

Paving

I-94 Reconstruction

Wisconsin

View Project

I-94 Reconstruction

Michels constructed secant compression ring launch and receiving shafts for a microtunneling project. The launch shaft was comprised of 46 intersecting 1-meter-diameter secant piles drilled to a depth of 54 feet. The receiving shaft was comprised of 38 intersecting 1-meter-diameter piles drilled to a depth of 52 feet.

Tunneling

Conduit 16 launch and receiving shafts

Colorado

View Project

Conduit 16 launch and receiving shafts

The Tualatin River microtunnel set a North American record for the tightest curve radius for an 84-inch pipe.

Microtunneling

Tualatin Interceptor and Siphon Improvements Design Build

OR

View Project

Tualatin Interceptor and Siphon Improvements Design Build

Horizontal Directional Drilling

Nexus Gas Transmission Pipeline

Michigan & Ohio

View Project

Nexus Gas Transmission Pipeline

Direct Pipe

Calumet River Direct Pipe

Illinois

View Project

Calumet River Direct Pipe

Deep Foundations

Yesler Terrace

Washington

View Project

Yesler Terrace

Microtunneling

Columbia Water Supply

Washington

View Project

Columbia Water Supply

Microtunneling

Delco Raw Water Pump Station

Ohio

View Project

Delco Raw Water Pump Station

Microtunneling

Schweitzer Pump House Wet Well & Intake Piping

Minnesota

View Project

Schweitzer Pump House Wet Well & Intake Piping

Michels Power, Inc. worked with an East Coast utility company to transform a 240-acre site on top of a closed coal mine into a 230kV electrical substation. Michels constructed 240 7-inch micropiles with rock sockets and drilled 190 shafts with rock sockets.

Substations

Pennsylvania substation

Pennsylvania

View Project

Pennsylvania substation

Michels Power, Inc. worked from barges to drill shafts to 60 inches in diameter and 17 to 22 feet deep while rebuilding a transmission line toppled by Hurricane Irma.

Storm Restoration Contractor

Line 4 Rebuild

Florida

View Project

Line 4 Rebuild

Michels Power, Inc. installed 27 concrete caisson foundations ranging from 7 to 10 feet in diameter and up to 64 feet in depth and 73 direct embed excavations 5 feet in diameter and up to 36 feet in depth to support Michels' construction of a transmission line.

Transmission & Distribution

Parnell to Williamsburg Transmission Line

Iowa

View Project

Parnell to Williamsburg Transmission Line

Michels trenchlessly installed 1,500 feet of 24-inch natural gas pipeline under a highway, creek and pond in a residential neighborhood.

Horizontal Directional Drilling

North Branch Pipe Replacement

Minnesota

View Project

North Branch Pipe Replacement

Michels was part of an integrated joint venture responsible for executive management field supervision and engineering on the Central Puget Sound Regional Transit Authority's University Link Light Rail Extension Project.

Earth Retention Systems

University Link Light Rail U230

Washington

View Project

University Link Light Rail U230

Michels was the prime contractor for the construction of the DePere to Suamico, portion of USH 41 from Orange Lane to Glory Road.

Aggregates

US Highway 41 Mainline DePere

Wisconsin

View Project

US Highway 41 Mainline DePere

This Michels Power, Inc. project consists of building 38 miles of transmission line as well as rebuilding nine miles of existing line in Massachusetts and Rhode Island.

Transmission & Distribution

New England East-West Solutions

Massachusetts and Rhode Island

View Project

New England East-West Solutions

Michels repaired the ground support systems along approximately 160 feet of wharf wall located southwest of the Milwaukee Metropolitan Sewerage District Headquarters parking lot.

Aggregates

MMSD Wharf Wall

Wisconsin

View Project

MMSD Wharf Wall

Michels performed inbound and outbound structure construction.

Earth Retention Systems

Lake Shore Drive

Illinois

View Project

Lake Shore Drive

Michels built 458 secant piles and 100 caissons in 90 days for a 10-story, 600,000-square-foot building on the site of the new McDonald's corporate headquarters.

Deep Foundations

110 N Carpenter

Illinois

View Project

110 N Carpenter

Michels Corporation completed a deep foundations package for a rail bridge to carry the Rock Island Metra tracks over tracks used by Amtrak and freight trains, eliminating at grade crossings.

Earth Retention Systems

Metra Flyover Bridge

Illinois

View Project

Metra Flyover Bridge

The HZ Wind project in Iowa is a project consisting of Wind turbines on 70m and 80m tower sections.

Foundations

HZ Windfarm Iowa

Iowa

View Project

HZ Windfarm Iowa

Michels removed the Wright and MacArthur Woods dams on the Des Plaines River, and stabilized and restored the associated banks

Inflow/Infiltration-Grouting-Manholes-Bypass Pumping

Des Plaines Dam Removal

Illinois

View Project

Des Plaines Dam Removal

Michels was the prime contractor for the reconstruction of King Court and construction of Beechtree Lane.

Manhole Rehabilitation

Beechtree Lane/ King Court

Wisconsin

View Project

Beechtree Lane/ King Court

Michels was the prime contractor for the major reconstruction of STH 67, Summit Avenue located in Oconomowoc, WI.

Aggregates

State Highway 67 Oconomowoc

Wisconsin

View Project

State Highway 67 Oconomowoc

Michels Power, Inc. excavated more than 166,000 lineal feet of 3-4 foot deep trenches for 16 solar farm sites at various locations throughout Minnesota.

Renewable Energy

Aurora Solar

Minnesota

View Project

Aurora Solar

Michels Power, Inc. built 3.8 miles of 230kV triple-bundle transmission line to connect the Lackawanna substation to a new substation.

Electrical Installation

Lackawanna Transmission Line

Pennsylvania

View Project

Lackawanna Transmission Line

New construction consisted of installation of a pre-cast culvert bridge and associated roadway along with tank trail parallel to the new roadway and reconstruction, contouring and planting of new wetlands.

USACE/Government Projects

Alderwood Dam Bridge

Wisconsin

View Project

Alderwood Dam Bridge

Michels rehabilitated a deteriorated culvert beneath the coal pile of an active power plant. Joint repairs on the culvert were completed prior to the application of a carbon fiber reinforced polymer (CFRP) wrap to reinforced and strengthened the existing culvert structure.

84" Wabash Culvert Repair

Indiana

View Project

84" Wabash Culvert Repair

Michels furnished and installed hundreds of soldier piles, permanent grouted anchors and 85,000 square feet of lagging for permanent earth retention along the Zoo Interchange.

Aggregates

Zoo Interchange Phase I

Wisconsin

View Project

Zoo Interchange Phase I

Michels was the concrete paving subcontractor for the construction of the Highway 26 Janesville - Fort Atkinson Road Interchange Project.

Aggregates

State Highway 26

Wisconsin

View Project

State Highway 26

Michels managed construction of the Airport Spur project as part of a joint venture.

Aviation

Airport Spur Mainline

Wisconsin

View Project

Airport Spur Mainline

Michels was construction manager for a project which included construction of the 38th Street ventilation facility, trail track tunnels and cross passages, Grand Central Terminal interlocking caverns, portions of the Grand Central Terminal main station caverns, escalator shaft interfaces and access tunnels.

Tunneling

Manhattan South Structures

New York

View Project

Manhattan South Structures

Michels is part of an integrated joint venture, responsible for the executive management, areas of field supervision, and heading engineer positions on the Central Puget Sound Regional Transit Authority's Northgate Link Extension Project.

Electrical Installation

North Gate Extension Light Rail N125

Washington

View Project

North Gate Extension Light Rail N125

Michels set up a portable recycle crushing plant at Mitchell International Airport to convert a decommissioned runway into base material for a new one.

Aviation

Mitchell International Airport

Wisconsin

View Project

Mitchell International Airport

Michels managed the construction of the Mitchell Interchange reconstruction mega project as part of a joint venture.

Paving

Mitchell Interchange

Wisconsin

View Project

Mitchell Interchange

Michels is preforming work in a joint venture with Halmar International for the removal of an existing drawbridge and replacement with a permanent bridge that has twice the clearance for marine traffic.

Mill Basin Bridge

New York

View Project

Mill Basin Bridge

Michels is the Prime Contractor for the construction of the STH 94-142 Interchange project.

Aggregates

Interstate Highway 94

Wisconsin

View Project

Interstate Highway 94

Michels used a specialized tool mounted to a track hoe to install 960,000 lineal feet of wick drain on the Highway 41-441 corridor expansion project.

Highway 41-441 Corridor

Wisconsin

View Project

Highway 41-441 Corridor

Michels performed heavy civil earthwork, concrete installation and storm sewer construction for two crossovers linking a taxiway with a runway.

Aviation

Dane County Airport Reconfiguration

Wisconsin

View Project

Dane County Airport Reconfiguration

Michels Corporation constructed an expanded airport apron.

Aviation

Appleton International Airport

Wisconsin

View Project

Appleton International Airport

Michels used microtunneling to build a 485-foot-long, 6-foot diameter tunnel under a major four-lane highway.

Tunneling

Mary Hill Bypass

Canada

View Project

Mary Hill Bypass

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee.

Foundations

Fiserv Forum

Wisconsin

View Project

Fiserv Forum

Michels was the prime contractor, and managed and constructed the piping and mechanical scopes and pump installation.

Facilities Construction

Facility Construction

Texas

View Project

Facility Construction

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels worked in close proximity to live freight and pedestrian rail traffic and overhead rail signal lines to construct a temporary pedestrian train platform.

Foundations

Train Platform

Illinois

View Project

Train Platform

Michels designed and installed an Earth Retention System (ERS) for a new pedestrian tunnel that was bored under three live Metra and Union Paci&#64257;c rail lines.

Foundations

Metra Lombard Station

Illinois

View Project

Metra Lombard Station

Michels installed 17 miles of electric and signal cables, conduits and splice boxes along Amtrak rail lines from Trenton to North Brunswick, NJ.

Railway Improvement Project

New Jersey

View Project

Railway Improvement Project

Michels installed a 4,000-foot land-to-land and a 1,600-foot water-to-land installation of 16-inch pipe.

Horizontal Directional Drilling

Salem Lateral

Massachusetts

View Project

Salem Lateral

Michels used the Direct Pipe methodology to install a 48-inch gas pipeline under the Rio Grande and the border between the United States and Mexico.

Direct Pipe

Rio Grande border crossing

Texas

View Project

Rio Grande border crossing

Michels used Direct Pipe methodology to complete two installations on a pipeline project in Texas.

Direct Pipe

Sweeny Midstream Spread D

Texas

View Project

Sweeny Midstream Spread D

Michels installed 7,000 feet of 2-inch conduit in a utility tunnel system in Minnesota.

Cell phone network upgrade

Minnesota

View Project

Cell phone network upgrade

Michels installs a 39-inch cured-in-place pipe (CIPP) liner to rehabilitate a sewer line.

Cured-In-Place Pipe (CIPP)

1-MN-341 Interceptor Rehabilitation

Minnesota

View Project

1-MN-341 Interceptor Rehabilitation

Auger Boring

Flanagan South Pipeline

IL & MO

View Project

Flanagan South Pipeline

Michels has the resources internally to self-perform the entire station construction project - mechanical, electrical, civil and painting.

Facilities Construction

Line 210 A, B & C Relocation at Cordelia Station

California

View Project

Line 210 A, B & C Relocation at Cordelia Station

Michels Power, Inc. installed 55 miles of 345-kV double and single circuit conductor lines.

Transmission & Distribution

WETT Segments 2 & 6 345kV Transmission Line

Texas

View Project

WETT Segments 2 & 6 345kV Transmission Line

Michels Power, Inc. installed approximately 250 miles of high voltage 345-kV AC transmission line.

Transmission & Distribution

Center-Grand Forks 345 kV Transmission Line

Minnesota and North Dakota

View Project

Center-Grand Forks 345 kV Transmission Line

Michels Power, Inc. constructed a 24.6-megawatt wind farm is located northeast of Healy, Alaska. Eva Creek is the largest wind farm in the state.

Renewable Energy

Eva Creek Wind Farm

Alaska

View Project

Eva Creek Wind Farm

Michels was part of a joint adventure that constructed a 5-mile long, 15-foot diameter tunnel under San Francisco Bay.

Tunneling

Bay Tunnel

California

View Project

Bay Tunnel

Michels constructed 21 miles of 52' wide rural freeway concrete paving.

U.S. Highway 41 Mainline

Wisconsin

View Project

U.S. Highway 41 Mainline

Michels built 4.3 miles of stone dike ranging from 4 to 8 feet high on the Green Bay lake bed to reconstruct the Cat Islands Chain.

Federal

Cat Islands

Wisconsin

View Project

Cat Islands

Individual commitment to a group effort - that is what makes a team work, a company work, a society work, a civilization work.

Vince Lombardi

Great teamwork can do great things.

Contact Us