Deep Foundations

Sports Arena

Sports Arena

Scope

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee. Michels also used deep dynamic compaction to increase the bearing capacity and decrease settlement of under-consolidated soil on the 6.5-acre site.

Projects

Michels installed caissons on a small site along the in downtown Chicago. The caissons ranged in diameter from 4 to 6 feet and were drilled to an average depth of 90 feet.

Deep Foundations

River Point Plaza

Illinois

View Project

River Point Plaza

Michels remediated a 5,400-linear foot dock wall to facilitate environmental dredging of the Menominee River at TYCO Fire Products, a manufacturing facility adjacent to the southern shore of the Menominee River.

Deep Foundations

Tyco Dockwall

Wisconsin

View Project

Tyco Dockwall

Michels designed and built an Earth Retention System to provide global stability for a recreational and ski hill that had been experiencing multiple slope failures.

Deep Foundations

Mont Du Lac

Wisconsin

View Project

Mont Du Lac

Michels designed and installed an Earth Retention System (ERS) for a new pedestrian tunnel that was bored under three live Metra and Union Pacific rail lines.

Deep Foundations

Metra Lombard Station

Illinois

View Project

Metra Lombard Station

Michels worked in close proximity to live freight and pedestrian rail traffic and overhead rail signal lines to construct a temporary pedestrian train platform.

Deep Foundations

Train Platform

Illinois

View Project

Train Platform

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Deep Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

The only way to be truly satisfied is to do
what you believe is great work.

Steve Jobs

It's not bragging if you can do it.

Contact Us