Ground Improvement

Sports Arena

Sports Arena

Scope

Michels installed 400 LF of sheet piling and 992 pipe piles to support construction in downtown Milwaukee. Michels also used deep dynamic compaction to increase the bearing capacity and decrease settlement of under-consolidated soil on the 6.5-acre site.

Projects

Michels installed caissons on a small site along the in downtown Chicago. The caissons ranged in diameter from 4 to 6 feet and were drilled to an average depth of 90 feet.

Foundations

River Point Plaza

Illinois

View Project

River Point Plaza

Michels designed and built an Earth Retention System to provide global stability for a recreational and ski hill that had been experiencing multiple slope failures.

Foundations

Mont Du Lac

Wisconsin

View Project

Mont Du Lac

Michels designed and installed an Earth Retention System (ERS) for a new pedestrian tunnel that was bored under three live Metra and Union Pacific rail lines.

Foundations

Metra Lombard Station

Illinois

View Project

Metra Lombard Station

Michels worked in close proximity to live freight and pedestrian rail traffic and overhead rail signal lines to construct a temporary pedestrian train platform.

Foundations

Train Platform

Illinois

View Project

Train Platform

Michels built caissons and installed H-pipes for the Torrence Avenue Bridge along the Grand Calumet River.

Foundations

IDOT Torrence Avenue

Illinois

View Project

IDOT Torrence Avenue

Michels installed 64 micropiles to construct a deep foundation system for an existing parking garage.

Foundations

Parking Garage

Wisconsin

View Project

Parking Garage

Quality means doing it right
when no one is looking.

Henry Ford

We do that.

Contact Us