Michels Road & Stone, Inc. was the prime contractor for the major reconstruction of STH 67, Summit Avenue located in Oconomowoc, WI. The project consisted of reconstructing 3.5 miles STH 67 and reconstructing the existing four lane divided highway into a six lane divided highway. The project also included reconstructing two bridges, four retaining walls, pedestrian tunnel, traffic signals and FTMS for 10 intersections. Michels also utilized custom crushing crews to recycle the existing roadway into salvaged base aggregates. Michels installed approximately 170,000 square yards of concrete pavement 9-inch, 10,000 linear feet of 36-inch integral curb and gutter, 145,000 tons of base aggregate dense, 40,000 tons of breaker run, and 55,00 square yards of geotextile fabric.

  • Michels was the prime contractor for the major reconstruction of STH 67, Summit Avenue located in Oconomowoc, WI.

Projects

Michels was the concrete paving subcontractor for the construction of the Highway 26 Janesville - Fort Atkinson Road Interchange Project.

Commercial Aggregates

State Highway 26

Wisconsin

View Project

State Highway 26

Michels was the prime contractor for the construction of the DePere to Suamico, portion of USH 41 from Orange Lane to Glory Road.

Commercial Aggregates

US Highway 41 Mainline DePere

Wisconsin

View Project

US Highway 41 Mainline DePere

Michels is the Prime Contractor for the construction of the STH 94-142 Interchange project.

Commercial Aggregates

Interstate Highway 94

Wisconsin

View Project

Interstate Highway 94

Michels simultaneously rebuilding and widening a 4.4-mile Central and 6.7-mile South segment of the project on a heavily traveled route linking between Chicago and Milwaukee. The roadway is being expanded from three lanes in each direction to four lanes plus widened shoulders.

Commercial Aggregates

I-94 Reconstruction

Wisconsin

View Project

I-94 Reconstruction

Michels was the prime contractor for a reconstruction at the Kenosha Regional Airport. Michels performed all excavation, pipe underdrain, aggregate placing, concrete pavement, and topsoil operations to completely reconstruct and extend the main east/west runway and taxiway for the
airport. The runway was extended 1,100 feet to allow for larger aircraft to safely land and take off.

Commercial Aggregates

Kenosha Regional Airport

Wisconsin

View Project

Kenosha Regional Airport

Michels built 4.3 miles of stone dike ranging from 4 to 8 feet high on the Green Bay lake bed to reconstruct the Cat Islands Chain.

Commercial Aggregates

Cat Islands