Starting you on the right track

Michels recognizes that you need to use the delivery method that is right for your project. In addition to traditional design-bid-build, Michels has completed numerous alternative delivery projects via alternative delivery methods, including design-build, progressive design-build, public-private partnership (P3), engineering procurement and construction (EPC), and early contractor involvement. This experience provides value by streamlining design and construction, offering more innovation opportunities, and enhancing communication.

Alternative delivery projects are successful when the design and construction teams are integrated from the start. Michels partners with owners during preconstruction on complex contracts to mitigate challenges. This early contractor involvement leads to better functionality. Our commitment to an integrated team includes those involved on a daily basis to those whose daily routines are affected by a project. We view alternative delivery as a way for you to receive the benefits of the ingenuity and creative collaboration of the designer and builder while still having control over the process and achieving your overall goals established with stakeholders.

All operations are supported by experienced leadership teams and a fleet of more than 14,000 pieces of heavy equipment. Michels' experienced crews and reliable equipment are ready for quick deployment from coast to coast for planned projects and emergency response work.

Benefits of Alternative Delivery:
Types of Alternative Delivery Michels offers:

Check out some of our successful Michels Design-Build projects:

Contact us to learn more.

 

Projects

Michels furnished and installed hundreds of soldier piles, permanent grouted anchors and 85,000 square feet of lagging for permanent earth retention along the Zoo Interchange.

Alternative Delivery

Zoo Interchange Phase I

Wisconsin

View Project

Zoo Interchange Phase I

The Tualatin River microtunnel set a North American record for the tightest curve radius for an 84-inch pipe.

Alternative Delivery

Tualatin Interceptor and Siphon Improvements Design Build

OR

View Project

Tualatin Interceptor and Siphon Improvements Design Build

Michels designed, furnished and installed a siphon system to draw down water elevation in a pond impoundment area and maintain upstream river flow during the removal of a high-risk dam. The system consisted of 14 30-inch HDPE siphons, flow-monitoring meters, stainless steel knife gate valves and a priming system.

Alternative Delivery

Boardman Dam removal

Michigan

View Project

Boardman Dam removal

Michels completed a complex design-build construction project for the Jacksonville Electric Authority performing horizontal directional drilling (HDD), reaming and pullback operations for a 36" steel water main that spanned 6,575'.

Alternative Delivery

St. John's River Crossing Design Build

Florida

View Project

St. John's River Crossing Design Build

Michels was part of a joint adventure that constructed a 5-mile long, 15-foot diameter tunnel under San Francisco Bay.

Alternative Delivery

Bay Tunnel

California

View Project

Bay Tunnel

The only way to be truly satisfied is to do
what you believe is great work.

Steve Jobs

It's not bragging if you can do it.

Contact Us